PERMIT APPLICATION COMMON
Where on your property are you working?:
Work on the property will be entirely contained within the leased unit (723 1st Ave) which occupies the northwest end of the building along Columbia St at ground level.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Commercial
Project Value:
200000
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
04/13/2022
Permit Issued Date:
08/10/2022
Inspections Completed Date:
02/03/2023
Certificate of Occupancy Issued Date:
02/03/2023
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
200000
Total Intake Value:
200000
Issue Value: New:
0
Issue Value: Alteration:
363575
Total Issued Value:
363575
BUILDING CODE INFO
What building code was used for your design?:
2018 SEBC
Is this a substantial alteration?:
No
Are you changing the envelope?:
No
Action Type:
Add/Alt
Number of Existing Building Stories:
9
Number of Existing Below-Grade Building Stories:
1
Number of Proposed Building Stories:
9
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
1
Is this a high-rise?:
Yes
Will you change the building use or occupancy?:
Yes
Main Existing Use of Building:
Business
Existing Occupancy:
B Bank
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
No
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Other
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
na
PARKING
# of Existing Onsite Parking:
0
# of Existing Offsite Parking:
0
# of Existing Accessible Parking:
0
# of Proposed Onsite Parking:
0
# of Proposed Offsite Parking:
0
# of Proposed Accessible Parking:
0
# of Existing Bicycle Parking Spots:
3
# of Proposed Bicycle Parking Spots:
3
Tenant Relocation Assistance
Residential Unit Occupancy:
No Residential Units on Property
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
Yes
Fire Alarm:
Yes
Other Fire Protection System:
No
Other Type of Sprinkler System:
13 system needed in TI area.
EMERGENCY SYSTEMS
Elevator Pressurization:
No
Stairway Pressurization:
No
Smoke Removal System:
No
Accessible Elevator Egress:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
Yes
Compliance Category:
Commercial
Compliance Path:
Prescriptive
Is there a commercial kitchen hood exhaust system?:
No
Is there a fume hood?:
No
Is there a spray paint booth?:
No
SPECIAL PROGRAMS
Is this project receiving Opportunity Zone Funds?:
No
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
BNBUII*990K3